Remington Medical Resort of San Antonio

Best Health Care Project

Text size: A A

The Remington Medical Resort of San Antonio was designed to be a first in its industry, combining patient care and therapy with the luxuries of a hotel resort. As the project morphed conceptual ideas to design, the team worked to make the project feasible, not only for the San Antonio location but also for future projects in different parts of Texas and the United States.

----- Advertising -----

Throughout design and construction, the team worked to streamline the project in order to standardize construction methods and provide a baseline from which future projects could be constructed.

The building’s original floor-to-floor heights were significantly reduced through value engineering in an attempt to reduce the cost of the project.

The owner, contractor, architect and engineers worked closely to find a balance between maintaining acceptable ceiling heights and still allowing room for HVAC ducts and plumbing. To make room for ductwork, the structural engineer reduced beam depths by adding a few columns in strategic locations. The HVAC engineers resized and rerouted ducts to keep ceiling heights as high as possible.

The architect redesigned the ceilings and established furred-down areas to fit around the new duct locations. The contractor reworked sprinkler lines, ducts and plumbing lines to further keep the ceilings as high as possible within the reduced floor-to-floor height.

Further challenging the project team was a mid-construction decree from the fire marshal that, because of the open atrium in the middle of the building, a smoke-control system would be required to meet code. The absence of chases or areas for exhaust shaft locations left designers with few options. After considerable rework, a shaft was created and masked with architectural millwork and louvres to blend the shaft into the decor of the building.

Key Players

Submitted by: EBCO General Contractor

Owner: Remington Rehab Investment Group LLC, Round Rock

General contractor: EBCO General Contractor Ltd., Cameron

Architect: Mayse & Associates Inc., Dallas

Structural engineer: DCI Engineers, Spokane, Wash.

Civil engineer: Vickery & Associates Inc., San Antonio

MEP engineer: Halff Associates Inc., Richardson

Landscape architect: BWM Group, Round Rock

Electrical contractor: R & L Electric Inc., Weatherford

HVAC contractor: Airco Mechanical Ltd., Austin

Plumbing contractor: S & K Plumbing, Haltom City

 

----- Advertising -----
Blogs: Texas & La. Staff
Our blog delivers the latest news, insights, and opinions about Texas & Louisiana construction.
Reader Photos
Photos from ENR Texas & Louisiana Photo Showcase
----- Advertising -----
 Reader Comments:

Sign in to Comment

To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.

We welcome comments from all points of view. Off-topic or abusive comments, however, will be removed at the editors’ discretion.